Summit 2011 Working Sessions/Session017/Deliverable 1

From OWASP
Revision as of 16:27, 24 January 2011 by Sandra Paiva (talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Deliverable 1

The OWASP 2011 Connection Plan – describing the current connections program and detailing the specifics for what will happen in 2011. The plan should contain specific goals and strategies for achieving the goals.

To be filled in.